Garcia Garcia is a family-owned design-and-build contractor from Santo Tirso, now run by the fourth generation, that is building the Danish medtech group Coloplast’s €110 million factory in Felgueiras — which the builder describes as Coloplast’s largest production unit. The firm closed 2025 with record turnover of €173 million, up 48% on 2024.
The Garcia family’s link to construction goes back to the 19th century, when it built chimneys for the textile mills of the Ave valley; according to Forbes Portugal almost every mill chimney in the region was built by the Santo Tirso firm. In the early 2000s the new generation repositioned Garcia, Garcia S.A. (NIF 501275800) as a Design & Build contractor that handles everything from site selection to architecture, engineering and execution, with industrial and logistics buildings now about 80% of its business. Turnover has been above €100 million for four consecutive years: €116.9 million in 2024 and a record €173 million in 2025, much of it from foreign direct investment. Recent clients named by the company and the press include Mercadona, Testo (Albergaria-a-Velha), Continental Mabor (Lousado), Logicor, VGP, Hines and Vieira de Castro.
Its main Nordic client is Coloplast. In December 2025 Garcia Garcia announced it had been chosen to build the Danish group’s new plant at the Alto das Barrancas business park in Revinhade, Felgueiras: a €110 million investment with a 37,000 m² footprint and 56,000 m² of construction across three buildings — a 38,600 m² production hall, a 5,300 m² logistics building and a 6,300 m² administrative block — with 11,350 m² of cleanrooms at the start. The builder said the plant could create 800 jobs in a first phase and was due for completion in the first quarter of 2026, and called it one of the largest foreign direct investments in Portugal in recent years. NorthSouth HQ covered the factory’s opening in this article; see also the Coloplast profile.
26 May 2026 — Selected to build Vieira de Castro’s €24 million factory in Vila Nova de Famalicão (Jornal de Negócios, Supply Chain Magazine).
4 May 2026 — Reports record 2025 turnover of €173 million, up 48% (ECO).
18 December 2025 — Announces the €110 million Coloplast Felgueiras contract (ECO, Jornal de Negócios, AICEP).
When Nordic manufacturers build in Portugal, Portuguese contractors capture a large share of the capital spend. Garcia Garcia’s Coloplast job is the clearest example in the corridor so far, and its design-build model — one contractor from site search to handover — is what Nordic groups without local engineering teams tend to look for when they set up Portuguese plants.
Sources: ECO, 18 Dec 2025; ECO, 4 May 2026; Forbes Portugal, May 2025; Jornal de Negócios, 26 May 2026; nif.pt. Fetched 2 November 2026.
Status: Compiled from public sources · Last verified: · Update this profile
Work at Garcia Garcia? Send corrections or additions. Every update is checked before it is published; submissions are reviewed within a few working days.
Fractio helps Portuguese B2B companies build the Nordic relationships, references and operational footprint they need to win in Sweden, Denmark, Norway and Finland.
Talk to Fractio →