Portuguese presence in the Nordics

Etermar Energia

Offshore Wind Structures (Setúbal)

Etermar – Energia, S.A. (NIF 517861011) is the renewable-energy company of the Setúbal maritime engineering group Etermar, incorporated in February 2024. Its first offshore-wind contract came from Denmark’s Ørsted and Poland’s PGE: more than 100 external working platforms for the turbine foundations of the 1.5 GW Baltica 2 wind farm, built from March 2025 at its own port site on the Sado estuary. It is now building the BayFloat concrete floating-wind prototype and is studying new offshore projects that could bring about €75 million in orders.

HeadquartersEstrada Nacional 10-4, Estuário do Sado – Mitrena, 2910-738 Setúbal
FoundedIncorporated 16 February 2024; launched in October 2024 as Etermar’s renewable-energy arm
Portuguese entityEtermar – Energia, S.A. — NIF 517861011; share capital €50,000; CAEs 23610 (concrete products), 25110 (metal structures), 30111 (metal vessels and floating structures), 35113 (renewable power generation)
Parent groupEtermar maritime engineering group, active for more than 50 years (Etermar – Engenharia, S.A., NIF 500101531, Setúbal)
LeadershipLuís Machado, executive director / CEO
Nordic customerØrsted (Denmark), jointly with PGE (Poland) — owners of the 1.5 GW Baltica 2 offshore wind farm
SiteOwn port facilities in Setúbal with more than 17 ha of construction area; the company says it is the country’s only privately owned port terminal
DirectionPortugal → Denmark

Corridor footprint

Etermar Energia is the youngest company of the Etermar group, a Setúbal maritime engineering business that Jornal Económico describes as active for more than fifty years in Portugal and abroad. Racius shows Etermar – Energia, S.A. (NIF 517861011) incorporated on 16 February 2024, with €50,000 of share capital, at Estrada Nacional 10-4 on the Sado estuary at Mitrena. It is registered for concrete products, metal structures, floating structures and renewable power generation. The group’s engineering company, Etermar – Engenharia, S.A. (NIF 500101531), shares the 2910-738 postcode. The group presented the new company in October 2024 as a renewable-energy branch focused on offshore wind. It has its own port facilities in Setúbal, a construction area of more than 17 hectares and expansion plans for 2026. At the time it was also a partner in ONDEP, a Horizon Europe wave-energy project, for which it was to cast reinforced-concrete floating foundations and make steel structures to be towed to Peniche.

Its Nordic customer is Ørsted. In March 2025 Ørsted and PGE Polska Grupa Energetyczna, joint owners and developers of the 1.5 GW Baltica 2 wind farm in the Polish Baltic, awarded Etermar Energia its first offshore-wind contract, for secondary foundation structures. The order covers the fabrication, storage and load-out of more than 100 external working platforms for the turbine foundations (ECO; Offshore Wind gives the figure as 100). All are fitted with a monopile door and two carry radar platforms. Work started that month at the Setúbal site; the contract value was not disclosed. Baltica 2 will use 107 Siemens Gamesa 14 MW turbines and is due to be fully commissioned by the end of 2027 (Offshore Wind, 20 March 2025). In the company’s statement, quoted by ECO, Luís Machado said the award came after almost three years of audits, qualification and tendering, and showed that Etermar had won the confidence of Ørsted, which he called the world’s largest and most experienced offshore-wind developer.

Why this matters for the corridor

Baltica 2 is in Polish waters, but Etermar qualified for it through a Danish developer’s supply chain, after almost three years of audits. The company told Jornal de Negócios in May 2026 that the Baltic project marked its entry into the European offshore value chain and that it is studying further international projects. For Portuguese metalworking and concrete firms that want Nordic offshore-wind work, its route shows what it takes: a waterside yard, supplier qualification with the developer, and a first secondary-steel package as the way in.

Recent activity

4 March 2026 — Construction starts at Setúbal on BayFloat, a reduced-scale semi-submersible concrete floating-wind platform funded through the Recovery and Resilience Plan’s mobilising agenda for the energy transition. Etermar Energia leads the consortium. BayWa r.e. holds the DNV-certified design, Secil supplies the concrete, VSL does the post-tensioning, WavEC provides a digital twin and INESC TEC the fibre-optic sensors. The triangular pontoon has sides of about 30 m and three 8 m towers. Completion is scheduled for July 2026, followed by two years of testing in real conditions (Jornal Económico).

30 March 2026 — Etermar Energia signs a contract with Energetus to assemble 14 HVO-ready emergency power modules in the first phase of the SIN01 project, part of Start Campus’s Sines DC 4.0 programme; the installation raises the data centre’s capacity to 33 MW (Jornal Económico).

18 May 2026 — The company tells Jornal de Negócios that it expects to grow more than 70% this year and is targeting €50 million of energy-sector turnover by 2030. It is studying new offshore projects that could bring around €75 million of orders over the next two to three years, but says larger industrial investment depends on Portugal’s planned offshore-wind auctions.

Sources: racius.com and nif.pt (NIF 517861011; NIF 500101531); Brazil Energy Insight / Offshore Engineer, “Portuguese Engineering Firm Launches Offshore Wind Branch” (23 October 2024); ECO, “Portuguesa Etermar fecha primeiro contrato para eólicas offshore no mar Báltico” (19 March 2025); Offshore Wind, “Portuguese Company Secures First Offshore Wind Contract for 1.5 GW Baltica 2” (20 March 2025); Jornal Económico (4 and 30 March 2026); Jornal de Negócios (18 May 2026). All fetched 6 October 2026.

Status: Compiled from public sources · Last verified: · Update this profile

Update this profile

Work at Etermar Energia? Send corrections or additions. Every update is checked before it is published; submissions are reviewed within a few working days.

Thinking about entering the Nordics?

Fractio helps Portuguese companies navigate Nordic market entry, regulatory requirements, partnership development and Nordic market dynamics.